simplefind

simplefind Industrial

Buying Solar Versus Signing a Power Purchase Agreement: A Step-by-Step Guide for Commercial Buyers

Before you request bids, learn how ownership and PPAs differ, gather site data, verify installers, and put the right questions to every bidder in writing.

By Renata Okafor ·

Two professionals on a commercial rooftop beside a solar array, one holding a layout drawing while the other reviews a stack of utility bills.
A facility manager and engineer reviewing a rooftop layout and twelve months of utility bills before requesting bids

Are you about to ask installers for bids, and wondering whether to buy a solar system outright or sign a power purchase agreement instead? The two paths look similar on a sales deck and behave very differently on a balance sheet, so it helps to work through the decision in order: understand the structures, prepare your site data, verify the installers, compare contract terms, and then ask your questions in writing. This guide is general information only, not financial, legal or tax advice, so run the final numbers past a licensed professional.

A facility manager and an engineer stand on a commercial rooftop beside a solar array, reviewing a layout drawing and a stack of utility bills before requesting bids.
A facility manager and engineer reviewing a rooftop layout and twelve months of utility bills before requesting bids

Understand the two main ways to pay for commercial solar

You can buy and own a system, paying an installer for design, equipment and installation. Or you can sign a solar power purchase agreement (SPPA), where a third-party developer owns, operates and maintains the system and you buy the electricity it produces for a set period. Under an SPPA you are buying the output, not the panels. The EPA notes this can help a host avoid high upfront capital costs, system performance risk, and complicated design and permitting work, and that the arrangement can be cash flow positive from the day the system is commissioned.

The tradeoff is who keeps what. With ownership, you keep the output and the federal tax credits. With a PPA, the developer keeps the system and the credits, which the EPA says usually results in lower energy prices for the end user. Compare both paths side by side before you request a single bid, so you know which kind of proposal you actually want. The EPA explains the basics on its solar power purchase agreements page.

Set goals and gather site information before asking for bids

Buying solar is a procurement process, much like buying a roof or an HVAC system. The Massachusetts Clean Energy Center advises that the person running the project understand the high-level options and costs before releasing a competitive bid, which is how you get a fair price. Its commercial procurement guidance is a useful model even outside Massachusetts.

Start by ranking your goals. Common ones include:

Then collect what every installer will need: a property map showing rooftop orientation, roof material, condition and age, your electrical capacity, and utility bills for the past twelve months. When every bidder prices the same conditions, the bids become comparable. Also confirm who controls the building. You can own or lease it, but for leased property the EPA notes that financing generally works best with a long-term lease.

Find and verify qualified installers

You can issue a request for proposals publicly and to several certified installers, or request quotes from a short list you already trust. MassCEC suggests looking at project data to find installers who have completed commercial work near you, which tells you they know local utilities and permitting offices.

Check credentials yourself rather than trusting a bid document. The NABCEP Professional Directory lets you search by name or certification number. Listings include credentials such as PV Associate, PV Installation Professional and PV Design Specialist, and each shows an expiry date. Confirm it is current.

Bring in the right people internally, too:

  1. A facility manager who knows the building
  2. An engineer to review the design
  3. A contract officer or attorney to review the agreement
  4. A financial officer to test whether the numbers hold up

Public guidance is thin on verifying references, insurance and licensing. Ask each bidder for those documents directly, and confirm licensing with your state licensing authority.

Compare PPA pricing and contract terms

A PPA sets its price in advance, either fixed or with an escalator that rises over time. Ask how fast the escalator climbs, because a small yearly bump compounds across a term that typically runs 15 to 20 years. Compare that term with the expected life of the equipment and your own plans for the property.

The EPA says the electricity price is typically at or slightly below the retail rate you would otherwise pay your utility. Ask which rate the discount is measured against, and request the utility rate schedule so you can check it. Most PPAs need no upfront capital, but look at total payments over the full term, not only first-year savings.

Dollar figures vary widely by state, system size and site. The sources reviewed give no national price ranges, so gather current local bids and check with your state energy office instead of trusting one estimate.

Clarify renewable certificates, tax credits, and offsite options

A PPA can be onsite, delivering power behind your meter, or offsite, delivering it at a set point on the grid. Both are physical PPAs. An offsite deal needs either a competitive retail market where you can choose your generator or a state that authorizes third-party agreements, so check your state first.

The contract should say who owns the renewable energy certificates (RECs) and who retires them. Retiring them is what lets you claim the electricity is renewable. If you plan to make environmental claims, get that term in writing. RECs can also be bought separately from third-party developers. The EPA covers this on its customer power purchase agreements page.

Ask the questions that decide the comparison

Put these to every bidder in writing so the answers line up:

  1. Who owns and retires the RECs?
  2. Is the rate fixed or an escalator, and how fast does it rise?
  3. How long is the contract term?
  4. Who keeps the federal tax credits?
  5. Is the price at or below the retail rate, and what is that rate?
  6. Does the installer hold a current NABCEP certification, and when does it expire?

The public sources do not list red flags, and they do not cover performance guarantees, maintenance duties, buyout or end-of-term options, or what happens if you sell or lease the property. Ask about each one anyway. A bidder who goes vague on those points is giving you information. Then have your attorney or contract officer read the whole agreement before you sign.

Sources

Still have a question?

Related guides

  1. Fixed or Variable: How to Choose a Business Electricity Contract Without Getting Caught Out

    A practical checklist for comparing quotes, avoiding the costly rollover to a deemed rate, and asking the right questions before you sign. By Renata Okafor
  2. What Happens to Your Business Energy Bill When the Contract Ends

    Letting a fixed-term energy contract lapse can quietly move your account to a much higher default rate, so knowing your end date, opt-out deadline and state rules matters. By Neil Ostrander
  3. How to Read a Commercial Electric Bill, Section by Section

    Supply, delivery and demand charges each answer a different question, and knowing which is which helps you spot errors and compare providers on total cost. By Gideon Aldaine

Recent searches

Health and crisis searches are never saved. Kept for this browser · Privacy

Clear your search history?

This removes every search, from this browser and from our servers. It can't be undone.