How to Choose a Contractor for a Tenant Build-Out Without Getting Burned
Before you compare bids, make sure the square footage, the building code and the schedule are pinned down in writing, because the lease, the drawings and the crew often disagree.

Verdict first: pick the contractor who will put the square footage, the code and the schedule in writing before you sign anything. Everything else is a sales pitch. A tenant build-out is where a lease, a set of drawings and a construction crew all have to agree on the same numbers. They often don't.

What a tenant build-out involves
A build-out turns a leased shell into a space your business can actually use. Walls, ceilings, restrooms, lighting, exits. The contractor you hire works inside rules set by the landlord, the building and the local jurisdiction, so you need to understand the lease before you compare a single bid.
Start with how the lease allocates cost. Under a triple net (NNN) lease, the tenant typically pays property taxes, maintenance and insurance on top of rent. Those costs belong in your budget next to the construction price. A cheap build-out in an expensive lease is not cheap.
One side note. Landlords sometimes ask for a tenant's sales reporting to judge how profitable the business is. Tenants may not be required to hand it over and may refuse. Read the lease language and confirm what is actually required before you send anything.
Confirm which square footage figure is in use
Square footage sounds like a fact. It is a choice of ruler. The BOMA 2010 Office Standard defines usable area and rentable area, and rentable area includes a share of common space such as lobbies and restrooms. The International Building Code (IBC) measures for a different purpose: life safety and occupant load. For Business (B) use, office occupant load is figured at 100 square feet per person, which drives exits and corridors.
The gap can be ugly. One architect describes a space listed at 7,948 square feet that measured 7,110. That is 838 square feet of rent, design and pricing built on a number nobody checked.
So ask the blunt questions. Which standard does the lease use? Has anyone field-measured the space? Who does it before design starts? When no plans exist, architects create as-built drawings by measuring the space, and the whole project moves forward from those. Then ask the contractor which figure they are pricing against. If the lease, the design and the bid disagree, get the gap resolved in writing before work begins.
Check how the contractor handles codes and schedules
Building codes are the rules architects design by and contractors build by, and the IBC defines the model code. Ask any candidate how they confirm their work follows the applicable code and what they do when a compliance question comes up. Vague answers are the answer.
Then ask about the schedule. Commercial schedules are not a calendar on a whiteboard. A mid-size office project can contain 400 to 1,200 scheduled activities. The usual process runs through activity definition, sequencing, duration and resource assignment, and a time-based execution plan. Dependencies matter too. Inspections, for example, have to happen before walls close over the work.
The AIA A201 General Conditions document addresses the contractor's duty to submit and maintain a construction schedule. Ask whether that document is part of the contract, and whether you will receive a written schedule that gets updated.
Permits run on a clock as well. Model codes derived from the IBC commonly treat a permit as expiring after about 180 days of inactivity. A stalled job can lapse and push your opening date. Ask how the schedule tracks permit windows, and confirm the exact timing with your local building department, since local rules differ.
Questions to ask and red flags to watch for
Bring these to every interview and compare the answers, not the charm:
- Which square footage figure, IBC or BOMA, is used for the lease, the design and the pricing?
- Who verifies the measurements before design begins?
- How will the schedule be maintained, and how will permit expiration windows be tracked?
- How do you confirm your work meets the applicable building code?
Now the red flags. A contractor or architect not working to the applicable code should prompt you to stop work until it is resolved. A listed square footage that has never been field-measured can hide a large difference. A schedule that could let a permit lapse through inactivity is a plain risk to your opening date.
On price: the research behind this guide gave no reliable US cost ranges for tenant build-outs, and costs vary widely by state, local market and the condition of the space. Ask each contractor for a written, itemized bid so you can compare like with like. Be wary of anyone who quotes a single number without seeing the space.
Gaps to research separately
Some of the most important questions are not answered here. Licensing, insurance and bonding requirements, and how to verify them, are not covered. Check with your state licensing agency and ask for proof of coverage from the contractor's insurance carrier.
Payment terms, change orders and dispute resolution for tenant improvement work are also outside the sources, as is how tenant improvement allowances get negotiated with landlords. Read those terms in the lease and the construction contract, and consider having a qualified attorney review them. Permit rules should be confirmed directly with the jurisdiction where the building sits.
This is general information, not legal, financial or professional advice. A licensed professional who knows your lease and your location should have the last word.
Please seek a professional. This article is general information, not legal advice. Please seek a licensed attorney in your state about your own situation.
Sources
- Searching for Stability | The CCIM Institute
- Strategic Approaches to Mastering Triple Net Lease Properties | Commercial Real Estate Development Association
- Commercial Real Estate Terms and Definitions | Commercial Real Estate Development Association
- The Office Market 2025: Turning the Corner | Commercial Real Estate Development Association
- Foundations of Real Estate Management Course | BOMA International
- IBC vs BOMA - SPD Architecture
- Understanding BOMA Standards in Construction and Renovation
- Commercial Construction Scheduling: Methods, Tools, and Timeline Management
Still have a question?
Related guides
-
Is That Professional Certification Worth Paying For? Test It Before You Spend a Dollar
Job postings, an independent issuer, and written renewal terms separate credentials that pay off from expensive decoration. -
Choosing a Managed IT Provider Without Trusting Blindly
Before you sign, make the provider show what it watches, who acts when something breaks, and who pays when it fails. -
What Managed IT Really Costs a Small Business, and Where the Guides Get Vague
Per-user rates look tidy in the headline, but onboarding fees, out-of-scope labor and the provider-written sources behind them tell a messier story.